
POCcelerator™ End User Competency Checklist
Education resource material designed to document competency mastery on-the-job. This Competency Checklist represents all learning objectives for the POCcelerator™ End User.
End User Competency Checklist POCcelerator™ Data Management System Once an employee has acquired the necessary knowledge and skills to perform basic operation tasks this checklist can be used to observe the employee perform the required tasks for their core job responsibilities and to document demonstrated competency. The observer places their initials and date beside the task when it is performed successfully. Successful completion for each task is determined by the facility. The standards used to evaluate can be documented in the “Criteria” section below. Use the area on the last page to record comments or areas of improvement. If necessary, the observer can record recommended next steps of action for areas of improvement or development opportunities. When all required tasks are completed, the supervisor and employee sign and date this document as a record of completion. Criteria - Standards for successful completion of each task (e.g., Accuracy, Time, Quality, etc.): Observer’s Initials Topic/Tasks and Completion Date System Overview Sign on and off the software Navigate and explain the software Routine Operations Monitor device status • Review the Dashboard Identify and resolve device alerts and events • Review the Dashboard filters, table columns, and buttons Result Management Review and resolve patient result status • Enter measurement data Review and validate quality control results • Enter QC measurement results • Add comments to QC measurements • Edit incomplete QC measurements Maintenance Perform required maintenance • Record a maintenance task • Export maintenance records Administration Add and manage operators Add and manage operator certifications • Record maintenance competency • Record test competency Unrestricted | Published by Siemens Healthcare GmbH © Siemens Healthcare GmbH, 2022 SIEMENS Master Template Effective Date: 11-Aug-2021 | HILS2225 Job Aid Effective Date: 12-May-2022 | HILS2282 Healthineers Competency Checklist | POCcelerator™ End User Effective Date: 12-May-2022 | HILS2282 Comments Areas of Improvement Next Steps ◼ Primary Operator ◼ Secondary Operator has been trained on the above documented tasks Supervisor: Employee: Date: SIEMENS Unrestricted | Published by Siemens Healthcare GmbH © Siemens Healthcare GmbH, 2022 Master Template Effective Date 11-Aug-2021 | HILS2225 Healthineers Page 2 of 2
- poccelerator
- education resource
- point of care
- end user